Conference Proceedings
Pacific Rim Congress, Gold Coast Qld, May 1990
Conference Proceedings
Pacific Rim Congress, Gold Coast Qld, May 1990
Recovery Optimisation at Oaky Creek Coal
A simple production technique has been initiated and implemented at Oaky Creek open cut coal mine to optimise recovery of coal from the relatively thin geological seams. The production technique is based upon minimising coal dilution through careful dragline operation and the selective use of mine mobile equipment to clean the top of coal. In addition, recovery of coal from the pits has been increased by refining blasting and dragline methods._x000D_
The implementation of the recovery optimisation programme at Oaky Creek has provided significant economic benefits from increased yield through the preparation plant by the reduction in dilution, and from increased raw coal tonnage through improved pit recovery methods.
The implementation of the recovery optimisation programme at Oaky Creek has provided significant economic benefits from increased yield through the preparation plant by the reduction in dilution, and from increased raw coal tonnage through improved pit recovery methods.
Contributor(s):
E J Browne, D Quemard, M M Williamson
-
Recovery Optimisation at Oaky Creek CoalPDFThis product is exclusive to Digital library subscription
-
Recovery Optimisation at Oaky Creek CoalPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1990
- PDF Size: 0.637 Mb.
- Unique ID: P199003132