Skip to main content
Conference Proceedings

Pacrim 87, Gold Coast, Queensland

Conference Proceedings

Pacrim 87, Gold Coast, Queensland

PDF Add to cart

The Hishikari Gold Deposit A Case History and Present Status of Exploration

High grade ores were intersected in 1981 by a scout drill carried out by the Metal Mining Agency of Japan during a reconnaissance dril ling programme. The original aim of the hole was to explore a deep target where geophysical anczralies overlapped the abandoned old drifts (gravity- high, resistivity-low by airborne EM, and resistivity-low near the surface and high at depth by Schlumberger deep sounding). Subsequently, a follow-up drilling programm was commenced by the Sumitcrro Metal Mining Co Ltd, and all the 18 holes intersected high grade ores. The resources were then "guestimated" to contain ca.120 tonnes gold with an average grade of 80g/t Au between -40m and +120n a.s.l. The underground development was started in December 1982 and the first crosscut intersected the ore body at 100m level (a.s.l.) in July 1985.
Return to parent product
  • The Hishikari Gold Deposit A Case History and Present Status of Exploration
    PDF
    This product is exclusive to Digital library subscription
  • The Hishikari Gold Deposit A Case History and Present Status of Exploration
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1987
  • PDF Size: 0.753 Mb.
  • Unique ID: P198707156

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.