The Bucket Wheel Excavator at Goonyella-A Case Study

Utah's Blackwater mine began operations in 1967. The four CQCA mines controlled by Utah followed over the period 1971 to 1979. Project feasibility studies for all these were based on open cut mining to overburden depths of 60 metres, with typical project lives of 12 to 16 years, depending on reserves Further studies, initiated after the mines had started, showed that continuation of open cut mining beyond the 60 metre highwall was viable. In 1973, the Deep Stripping Project (DSP) was launched to define the scope for stripping deeper, to determine what the additional equipment needs might be, and to pu forward proposals for a full scale trial system. The project commenced at grass roots with a literature survey, proceeded through a sequence of equipment evaluation, specification, design and manufacture to the commissioning of the Goonyella BWE system. Studies are continuing to assess the future deep stripping requirements for all Utah's Bowen Basin mines.
Return to parent product
  • The Bucket Wheel Excavator at Goonyella-A Case Study
    PDF
    This product is exclusive to Digital library subscription
  • The Bucket Wheel Excavator at Goonyella-A Case Study
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1983
  • PDF Size: 0.439 Mb.
  • Unique ID: P198303034

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.