Conference Proceedings
Qld Coal Symposium, Brisbane, August 1991
Conference Proceedings
Qld Coal Symposium, Brisbane, August 1991
Highwall Mining Trials at Callide Mine
This paper describes the planning, analysis, design and operational experience of highwall mining based on auger drilling techniques applied to thick coal seams exposed in an opencut highwall. Being the first time such technology has been used in Australia, a large commitment to technical design and logistics planning was given by Callide Coalfields Pty Ltd._x000D_
This commitment included technical and operations management and supervision, mine services, and the retention of consultants to undertake geotechnical analysis, instrument preparation and instrument installation.
This commitment included technical and operations management and supervision, mine services, and the retention of consultants to undertake geotechnical analysis, instrument preparation and instrument installation.
Contributor(s):
W Seib, G Boyd
-
Highwall Mining Trials at Callide MinePDFThis product is exclusive to Digital library subscription
-
Highwall Mining Trials at Callide MinePDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1991
- PDF Size: 0.681 Mb.
- Unique ID: P199105013