Conference Proceedings
Recent Technical and Social Advances in the North Australian Minerals Industry, North West Queensland
Conference Proceedings
Recent Technical and Social Advances in the North Australian Minerals Industry, North West Queensland
Simulation of Copper Ore Handling at ISA Mine
A computer simulation has been developed to model the flow of copper ore in Isa Mine._x000D_
It simulates extraction of copper ore from the 1100 orebody by load-haul-dump (LHD) units to ore passes, haulage from chutes on 19 level by Rockflo trains to crusher bins, crushing and hoisting. It can assess in terms of the tonnage and head grade of ore hoisted, the effect of varying operating strategies, as well as measur- ing shortfalls in required capacities of any of the operations (extraction, hauling, crushing and hoisting). The simulation was designed as a modular, deterministic, steady-state model with parameter input allowing complete flexibility in its use._x000D_
Queuing theory is used extensively to evaluate the effect of interference at potential bottlenecks. The model has been used to determine the effect on production of varying train sizes, maintenance policies on the haulage circuit, orepass capacities, and extraction operations.
It simulates extraction of copper ore from the 1100 orebody by load-haul-dump (LHD) units to ore passes, haulage from chutes on 19 level by Rockflo trains to crusher bins, crushing and hoisting. It can assess in terms of the tonnage and head grade of ore hoisted, the effect of varying operating strategies, as well as measur- ing shortfalls in required capacities of any of the operations (extraction, hauling, crushing and hoisting). The simulation was designed as a modular, deterministic, steady-state model with parameter input allowing complete flexibility in its use._x000D_
Queuing theory is used extensively to evaluate the effect of interference at potential bottlenecks. The model has been used to determine the effect on production of varying train sizes, maintenance policies on the haulage circuit, orepass capacities, and extraction operations.
Contributor(s):
R N Hatherly, B R Ruffles
-
Simulation of Copper Ore Handling at ISA MinePDFThis product is exclusive to Digital library subscription
-
Simulation of Copper Ore Handling at ISA MinePDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1974
- PDF Size: 0.306 Mb.
- Unique ID: P197402017