Conference Proceedings
                        Research and Development in Extractive Metallurgy, Adelaide
Conference Proceedings
                            Research and Development in Extractive Metallurgy, Adelaide
Oxygen Leaching of Copper-Lead Matte in Acidic Chloride/Sulphate Solutions
                            
A hydrometallurgical process was developed for recovery of copper from copper-lead matte formed as an intermediate product at the BHAS lead smelter at Port Pirie. A plant utilizing this process was commissioned in 1984. The leach step involves oxidation of the copper-lead matte in an oxygenated acidic chloride-sulphate leachant. The results of laboratory scale testwork from which the chemistry of leaching was deduced, are presented in this paper. The rate of recovery of copper to solution from copper-lead matte depends largely_on the availability of oxygen to the sulphide surface. The optimum leach temperature is approximately 85C. Free acid must be supplied according to the stoichiometry of the leach reaction: Cu1.91 S + PbS + 2.91 H2SO4 + 1.455 02 = 1.91 Cu2+ + 1.91 SOj- + PbSO4(s) + 2.91 H2O + S The grind size of the matte is of minor significance. Chloride concentration in leachant should be at or above a minimum of 10.0 g/l. Chloride acts to complex cuprous ions formed during leaching.
                        
                    
                        
                                    
                                        Contributor(s):
                                    
                                    N E Meadows, N J Ricketts, G D J Smith
                                
                            - 
                                                            SubscribeOxygen Leaching of Copper-Lead Matte in Acidic Chloride/Sulphate SolutionsPDFThis product is exclusive to Digital library subscription
 - 
                                                            Add to cartOxygen Leaching of Copper-Lead Matte in Acidic Chloride/Sulphate SolutionsPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
 
                                        
                                        PD Hours
                                    
                                    
                                        
                                            Approved activity
                                        
                                    
                                - Published: 1987
 - PDF Size: 0.445 Mb.
 - Unique ID: P198704019