Skip to main content
Conference Proceedings

Resources and Reserves, Sydney

Conference Proceedings

Resources and Reserves, Sydney

PDF Add to cart

Estimation and Reporting of Copper Ore Reserves at Mount Isa Mines Limited

In line with the recommendations of The AusIMM/AMIC Joint Committee Report in 1981 Isa Mine ore reserves are quoted in proven and probable categories (recoverable ore reserves). Internal reporting considers geological mining and extraction reserves in terms of proven and probable categories. Proven reserves are subdivided into detailed and confirmed ore. External reporting includes a possible ore category (not a reserve). The basis for these divisions is the spatial distribution of sampling data. Proven ore is defined by data 80m apart or less and probable ore by data 80m to 150m apart. Within the proven ore category detailed ore is defined by data 40m apart or less and confirmed ore by data 40m to 80m apart. Kriging is used to provide tonnage and grade information for the currently producing 1100 and 1900 orebodies. Kriged cross sections are initially produced to coincide with existing geological sections and are used for stope design. Stope ore reserves calculations are ideally performed at three discrete design stages, which in order of increasing accuracy are: preliminary design (PD), final design (FD) and ring design (RD). At each of these stages Kriged meshes incorporating the most recent sampling information are produced for reserve calculations. Historically derived mining and extraction factors are applied both to global reserves and individual stope reserves to reflect changes in geological and mining conditions as well as the sequencing of extraction. These factorised reserves are then inserted into the computerised reserves inventory system (RIN). Monitoring of individual stope performance continues into the production stage with input from planning, research, survey and production personnel. This allows actual extraction factors to be derived for comparison with predicted factors, providing some measure of stope performance.
Return to parent product
  • Estimation and Reporting of Copper Ore Reserves at Mount Isa Mines Limited
    PDF
    This product is exclusive to Digital library subscription
  • Estimation and Reporting of Copper Ore Reserves at Mount Isa Mines Limited
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1987
  • PDF Size: 0.734 Mb.
  • Unique ID: P198710010

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.