Skip to main content
Conference Proceedings

Resources and Reserves, Sydney

Conference Proceedings

Resources and Reserves, Sydney

PDF Add to cart

Grade/Tonnage Curves and Optimization of a Mining Project

Since its beginning, with the works of D. Krige and later, G. Matheron, geostatistics has been analyzing in detail the essential factors at play in ore reserves estimation problems, with the ever-present aim of an optimal use of the available information. Not only do the reserves depend on the geological in situ resources, they also require a correct appraisal of many technical and economical parameters. The objective of the present paper is to show how the method of technical parameterization of reserves, which is at the heart of the geostatistical approach, provides an extremely powerful and versatile tool for characterizing a mining project. After a review of the main properties of the technique, its use in the economic optimization of a project will be examined. Two examples from copper and gold deposits will be given.
Return to parent product
  • Grade/Tonnage Curves and Optimization of a Mining Project
    PDF
    This product is exclusive to Digital library subscription
  • Grade/Tonnage Curves and Optimization of a Mining Project
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1987
  • PDF Size: 0.323 Mb.
  • Unique ID: P198710013

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.