Skip to main content
Conference Proceedings

Rock Breaking Equipment and Techniques, Melbourne

Conference Proceedings

Rock Breaking Equipment and Techniques, Melbourne

PDF Add to cart

Drilling and Blasting Operations at the Kennedy Siltstone Open Cut of Mount Isa Mines Limited

The Kennedy Siltstone Open Cut provides graded rock for stope filling. Rotary drilling of 310 mm blastholes with a Gardner Denver GD120 is used, and the successful application of an equilateral triangular drilling pattern is described. Charging practices and the development of bulk slurry handling are outlined. Blast monitoring plays an important role in K.S.O.C._x000D_
drilling and blasting operations. The proximity of nearby residential areas (1300 m) and the Mount Isa Airport (4500 m) necessitates special attention with regard to the minimisation of both air blast and ground vibration levels. The application and control of drilling and blasting parameters has had a direct bear- ing on success of the mining operations and also played an important role in reducing the disturbance to the community.
Return to parent product
  • Drilling and Blasting Operations at the Kennedy Siltstone Open Cut of Mount Isa Mines Limited
    PDF
    This product is exclusive to Digital library subscription
  • Drilling and Blasting Operations at the Kennedy Siltstone Open Cut of Mount Isa Mines Limited
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1978
  • PDF Size: 0.718 Mb.
  • Unique ID: P197802008

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.