Skip to main content
Conference Proceedings

Rock Breaking Equipment and Techniques, Melbourne

Conference Proceedings

Rock Breaking Equipment and Techniques, Melbourne

PDF Add to cart

Problems of Secondary Breaking

Experimentation with new methods, materials and machines to improve primary drilling and blasting is a continuing practice in the hard rock quarry operations of the BMI Group. These experiments will continue in the remote hope that one day we may produce a perfect feed for the primary crusher. As this day is still a long way off, the necessity to break oversize boulders will be a problem to be faced for the foreseeable future. To gauge the efficiency of primary blasting from this point of view, BMI monitor the tonnes of material crushed in the primary crusher for each boulder requiring secondary breaking. Over a period of about 10 years, this figure has improved from 30 tonnes througi the primary crusher per boulder, to 100 tonnes per boulder at our largest operation, which produces in excess of 2 million tonnes per year. Evan with this improvement, 25,000 boulders require secondary breaking each year This paper does not provide the solution to this problem, as like primary blasting, it will have to be constantly reviewed as new products and techniques become available. The paper sets out all of the methods tested or considered for test by BMI and our nnnn1iicinnq nn Chair PffPr.tivPness . Economic
Return to parent product
  • Problems of Secondary Breaking
    PDF
    This product is exclusive to Digital library subscription
  • Problems of Secondary Breaking
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1978
  • PDF Size: 0.298 Mb.
  • Unique ID: P197802018

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.