Conference Proceedings
Rock Breaking Equipment and Techniques, Melbourne
Conference Proceedings
Rock Breaking Equipment and Techniques, Melbourne
Rock Breaking on the Melbourne Undergroudn Rail Loop
Techniques and results achieved during the excavation of the Melbourne Underground Rail Loop (HURL) are summarised and discussed in the context of the various restraints present in a typical urban construction project. Mechanical methods (as distinct from those utilising blasting)accounted for the bulk of the excavation. Ground support was critical in this particular geological excavation setting, but is not discussed in detail except insofar as it constitutes a restraint to excavation progress.
Contributor(s):
A J Neyland
-
Rock Breaking on the Melbourne Undergroudn Rail LoopPDFThis product is exclusive to Digital library subscription
-
Rock Breaking on the Melbourne Undergroudn Rail LoopPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1978
- PDF Size: 1.333 Mb.
- Unique ID: P197802020