Conference Proceedings
Sampling Practices in the Mineral Industries, Melbourne
Conference Proceedings
Sampling Practices in the Mineral Industries, Melbourne
Design and Development of Slurry Sampling Equipment for Mount Isa On-Stream Analysis Equipment
The design and development of slurry sampling equipment for the Mount Isa Mines Limited on stream analysis installations is discussed in detail. Emphasis is given to the critical areas of slurry transport, screen design, pump selection, elimination of fast wearing components and maintenance reduction. Sample point design to fulfil the specific accuracy requirements for On Stream Analysis (3% to 10% relative) is discussed.
Contributor(s):
R Greenwood-Smith, P Wickham, M R Raeburn
-
Design and Development of Slurry Sampling Equipment for Mount Isa On-Stream Analysis EquipmentPDFThis product is exclusive to Digital library subscription
-
Design and Development of Slurry Sampling Equipment for Mount Isa On-Stream Analysis EquipmentPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1976
- Unique ID: P197604005