Skip to main content
Conference Proceedings

Sampling Practices in the Mineral Industries, Melbourne

Conference Proceedings

Sampling Practices in the Mineral Industries, Melbourne

PDF Add to cart

Sampling and Blending Practice for a 5000 Tonne/Day Iron Blast Furnace

Large blast furnaces demand high standards of preparation of feed materials which must meet tight specifications of chemical and physical quality. Measurement of these factors must be expeditious but the nature of the coke, sinter, ores and fluxes and the large tonnages involved requires substantial mechanical sampling plant. The equipment, its operations, and its problems, associated with the 5000 t.p.d. No.5 blast furnace at Australian Iron and Steel Pty. Ltd., Port Kembla, are described and the efficacy of chemical blending achieved in the ore blending yards and sintering operation, is reported.
Return to parent product
  • Sampling and Blending Practice for a 5000 Tonne/Day Iron Blast Furnace
    PDF
    This product is exclusive to Digital library subscription
  • Sampling and Blending Practice for a 5000 Tonne/Day Iron Blast Furnace
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1976
  • PDF Size: 0.131 Mb.
  • Unique ID: P197604017

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.