Conference Proceedings
Second Australasian Ground Control in Mining Conference 2010
Conference Proceedings
Second Australasian Ground Control in Mining Conference 2010
Changing the Ground Support in Cemented Hydraulic Backfill at CSA Mine
CSA mine, which is a deep level copper operation, located 12 km north of Cobar, NSW, currently uses a top down stoping method, utilising cemented hydraulic backfill (CHF) to fill and stabilise the stoping void thus assisting the extraction sequence. The stope sequence then requires development back through the CHF stope so that the necessary infrastructure for the subsequent stoping, such as raise bore pads can be sited. The primary and secondary support installed in the CHF consisted of 100 mm thick fibrecrete from floor to floor with 7_x000D_
2.4 m long resin support tendons installed at 1.5 m ring spacing. This support system relied on the resin achieving a quality bond with the CHF, and also the fibrecrete developing early structural strength due to the use of an accelerator. In addition to the delays in the excavation turn around time, it was felt that a superior support system could be designed. Such a system was designed; risk assessed, tested underground, and trialled in selective CHF digouts, and eventually signed off as the chosen support method in CHF digouts._x000D_
This paper discusses the change from a passive support system used in CHF digouts to an active support system using Swellex bolts and weld mesh, which has provided an active support system, that is superior, faster to install, reduced the excavation turn around time and is overall a cheaper support system.
2.4 m long resin support tendons installed at 1.5 m ring spacing. This support system relied on the resin achieving a quality bond with the CHF, and also the fibrecrete developing early structural strength due to the use of an accelerator. In addition to the delays in the excavation turn around time, it was felt that a superior support system could be designed. Such a system was designed; risk assessed, tested underground, and trialled in selective CHF digouts, and eventually signed off as the chosen support method in CHF digouts._x000D_
This paper discusses the change from a passive support system used in CHF digouts to an active support system using Swellex bolts and weld mesh, which has provided an active support system, that is superior, faster to install, reduced the excavation turn around time and is overall a cheaper support system.
Contributor(s):
P Brenchley
-
Changing the Ground Support in Cemented Hydraulic Backfill at CSA MinePDFThis product is exclusive to Digital library subscription
-
Changing the Ground Support in Cemented Hydraulic Backfill at CSA MinePDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2010
- PDF Size: 0.841 Mb.
- Unique ID: P201009006