Managing the Closure and Reopening of the South Ramp at Telfer Gold Mine During Sublevel Cave Breakthrough into the Open Pit

The Newcrest Mining Limited Telfer Gold Mine consists of an underground sublevel cave (SLC) operation located 734 m directly below active open pit operations. Open pit and underground current production rates are 50 million and 5.7 million tonnes per anum (Mt/a) respectively._x000D_
The SLC was initiated in late 2006 with breakthrough planned to occur on the 5484 bench of the west wall in late 2009. Risk to the south ramp was identified during this time, resulting in the construction of the north ramp. The SLC was continually tracked from initiation with a suite of monitoring systems and managed with a Major Hazard Management Plan (MHMP) and associated Trigger Action and Response Plans (TARP)._x000D_
At breakthrough the eastern limb of the cave was located within a 70 m horizontal distance from the south ramp. The south ramp was closed in October 2009 due to significant slope deformation, extensive cracking in the berms and batters between the ramp and breakthrough bench and a major failure 250 m to the north of the cave breakthrough. Wall response was first identified from slope deformation measurements taken by the wall monitoring radar in May 2009, at which point the SLC was 160 m from breakthrough. The impact of the SLC on the slope is a unique case with the monitoring systems in place able to provide data on the slope reaction to the SLC progression._x000D_
This paper will discuss the management of the south ramp such as the early interpretation of risk associated with cave breakthrough, monitoring systems implemented to track the cave progression and wall deformation, data integration and interpretation and risk management. Following the closure of the south ramp further instrumentation programs and risk assessments were conducted to determine the risk of re-opening this haulage route. The outcomes of this program will also be presented.
Return to parent product
  • Managing the Closure and Reopening of the South Ramp at Telfer Gold Mine During Sublevel Cave Breakthrough into the Open Pit
    PDF
    This product is exclusive to Digital library subscription
  • Managing the Closure and Reopening of the South Ramp at Telfer Gold Mine During Sublevel Cave Breakthrough into the Open Pit
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2010
  • PDF Size: 4.777 Mb.
  • Unique ID: P201009011

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.