Skip to main content
Conference Proceedings

Second Australasian Ground Control in Mining Conference 2010

Conference Proceedings

Second Australasian Ground Control in Mining Conference 2010

PDF Add to cart

Pillar Design Procedures and Research Methodologies - Can There or Should There be a Unified Approach?

After some 50 years of worldwide research in relation to coal pillar mechanics and design as well as numerous workshops and technical papers related to these issues there is still some significant disagreement as to the approach one should adopt in the assessment and design of a coal pillar._x000D_
Of course there are many different types of coal pillars that fulfil a wide range of roles at any particular mine and in this instance it is appropriate to have a tailored' approach for each pillar type in relation to the role it fulfils. However where it can become very difficult for the mine operators is when various researchers or consultants use or recommend significantly different approaches for the same type of pillar fulfilling the same role._x000D_
By 1999 two pillar design techniques had been developed specifically for the Australian underground coal mining industry (ie The University of New South Wales Pillar Design Procedure, UNSW PDP and Analysis of Longwall Tailgate Serviceability, ALTS) and several other pillar design techniques were being practiced by individual consultants. The Australian industry hoped to resolve the issue of what technique to use for each pillar type and role, when it funded UNSW in 2000 to develop a Systems Approach to Pillar Design'._x000D_
The findings of the abovementioned project were published in 2005 and while every attempt was made by UNSW to include the views of various local and overseas researchers and consultants it would be fair to say that a unified approach to pillar design in Australia was not adopted as a result of that project. This is the experience of one country where there has never been one central group solely undertaking such research in relation to pillar design (such as the Chamber of Mines in South Africa). This paper explores the Australian experience in terms of pillar research and what that experience may offer to researchers in Australia and other countries._x000D_
At the First Australasian Ground Control in Mining Conference (2003) the first update' of the ALTS Design Methodology (ie ALTS II) was presented. In subsequent years the ALTS database was continually updated and significantly expanded such that it now includes detailed information in relation to both the tailgate (148 cases) and maingate belt road (58 cases). In addition to tailgate roof support and chain pillar design, the current version of ALTS (referred to as ALTS 2009) includes a maingate belt road roof support design module. This paper is also intended to update and summarise the development and application of the ALTS Design Methodology for longwall gateroad design over the last decade both directly and in the context of coal pillar research conducted in Australia over the last 15 years.
Return to parent product
  • Pillar Design Procedures and Research Methodologies - Can There or Should There be a Unified Approach?
    PDF
    This product is exclusive to Digital library subscription
  • Pillar Design Procedures and Research Methodologies - Can There or Should There be a Unified Approach?
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2010
  • PDF Size: 1.208 Mb.
  • Unique ID: P201009008

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.