Conference Proceedings
Second Large Open Pit Mining Conference, Latrobe Valley Vic
Conference Proceedings
Second Large Open Pit Mining Conference, Latrobe Valley Vic
Artificial wall Support Using Tamrock Cablebolter DHA600
It is a well known fact that the best method of rock reinforcement is to avoid physical ground support. This goal can be achieved by means of: - Increasing the rock structural strength - Geological definition and forecasting._x000D_
- Sequencing the excavation - Smooth blasting In many cases however, extra ground support is needed in order to maintain safe working conditions. In an open pit, the structural strength of rock cannot be increased by lowering the pit walls due to economical reasons. Economy demands steeper walls and less waste to be hauled to the dump. The geological conditions can also often be extremely poor and unpredictable. For excavation sequencing and smooth blasting there are good possi- bilities, such as cleaning of the pit walls after the main excavation, arul- ing of long small diameter straight inclined holes, use of smooth blasting techniques and lightened explosives.
- Sequencing the excavation - Smooth blasting In many cases however, extra ground support is needed in order to maintain safe working conditions. In an open pit, the structural strength of rock cannot be increased by lowering the pit walls due to economical reasons. Economy demands steeper walls and less waste to be hauled to the dump. The geological conditions can also often be extremely poor and unpredictable. For excavation sequencing and smooth blasting there are good possi- bilities, such as cleaning of the pit walls after the main excavation, arul- ing of long small diameter straight inclined holes, use of smooth blasting techniques and lightened explosives.
Contributor(s):
J Leppanen
-
Artificial wall Support Using Tamrock Cablebolter DHA600PDFThis product is exclusive to Digital library subscription
-
Artificial wall Support Using Tamrock Cablebolter DHA600PDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1989
- PDF Size: 0.252 Mb.
- Unique ID: P198902006