Conference Proceedings
Second Large Open Pit Mining Conference, Latrobe Valley Vic
Conference Proceedings
Second Large Open Pit Mining Conference, Latrobe Valley Vic
Ballymoney Lignite Deposit
This paper presents an overview of the strategy adopted to bring the Ballymoney opencut lignite deposit to an advanced stage of mine design and confidence. Certain aspects of the project differentiate it from the normal Australian experience. These include the thick overlying glacial drift, the proximity to established infrastructure and the wide fluctua- tions in annual lignite demand. The incorporation of these factors in the mine plan are discussed. The deposit area is located near the town of Ballymoney, in Northern Ireland. In July 1986, after winning an internationally competitive tender, Meekatharra Minerals Ltd commenced an exploration programme designed to delineate reserves to supply a 450 MW power station. In less than eighteen months, a complete evaluation was undertaken and a price submitted in December 1987 to the relevant authorities for the supply of lignite. Subsequently, UK government consultants and significant inter- national banks have endorsed the findings. The mining study commenced with the evaluation of various develop- ment strategies, followed by selection of the most viable mining method and equipment. The equipment selected will mine four million tonnes of lignite and eleven million cubic metres of waste each year. In year 15, the waste removal requirement increases to almost seventeen million cubic metres. This results in an average strip ratio over the mine life of three cubic metres of waste per tonne of lignite. The quality of the product delivered to the run of mine conveyor transfer point, based on maximum resource recovery, will include heat content of 8813 kJ/kg (3789 Btu/Ib), ash content of 28% and moisture content of 40%.
Contributor(s):
R Hall
-
Ballymoney Lignite DepositPDFThis product is exclusive to Digital library subscription
-
Ballymoney Lignite DepositPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1989
- PDF Size: 0.912 Mb.
- Unique ID: P198902007