Skip to main content
Conference Proceedings

Second Large Open Pit Mining Conference, Latrobe Valley Vic

Conference Proceedings

Second Large Open Pit Mining Conference, Latrobe Valley Vic

PDF Add to cart

GPSS Computer Simulation of Equipment Requirements for the Iron Duke Mine

The South Middleback Ranges (SMR) operation involves the develop- ment of iron ore resources at the Iron Duke mine in the South Middle- back Ranges to replace the Iron Baron mine whose reserves are nearing depletion. The Iron Duke mine will be developed by contract to the stage where it can continue operation at full production when Iron Baron is closed. As part of the mine planning of the operation a GPSS computer simulation model was written to determine equipment requirements. The model simulated the operation of the mine with trucks transporting ore and waste to the appropriate destinations and producing a blended product in the stockpiles. A loader and two trucks would transport ore from the stockpiles to the crusher for one shift per day. The simulation shut the operation down at crib, morning tea, shift change and weekends, and also on the third shift each day. It also modelled operating delays. The results gave equipment operating hours and total output of each material type. The model was modified to produce different outputs from the mine and could be used to determine the most productive shift arrangement.
Return to parent product
  • GPSS Computer Simulation of Equipment Requirements for the Iron Duke Mine
    PDF
    This product is exclusive to Digital library subscription
  • GPSS Computer Simulation of Equipment Requirements for the Iron Duke Mine
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1989
  • PDF Size: 0.313 Mb.
  • Unique ID: P198902017

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.