Conference Proceedings
Second Large Open Pit Mining Conference, Latrobe Valley Vic
Conference Proceedings
Second Large Open Pit Mining Conference, Latrobe Valley Vic
Morwell Open Cut: Mine Scheduling
Morwell Open Cut is a continuous mining operation employing 5 buck- etwheel excavators, I bucket chain excavator and 54 conveyors. The combined bunkering capacity at both client Power Stations represents less than 12 hours maximum coal demand. This creates an extremely dynamic operating environment, which is further complicated with significant variations in both excavating and transportation plant capabilities. To achieve set objectives, including- I adequate reserves, 2 coal supply reliability, 3 cyclic plant maintenance, 4 minimal cost of coal, scheduling of the operation requires constant monitoring and reappraisal.
Contributor(s):
R Polmear, P Brimblecombe
-
Morwell Open Cut: Mine SchedulingPDFThis product is exclusive to Digital library subscription
-
Morwell Open Cut: Mine SchedulingPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1989
- PDF Size: 0.621 Mb.
- Unique ID: P198902028