The process of refurbishment is not a precisely defined one. It is under- stood to mean an upgrading of a plant which is normally performed only once. The application of refurbishment in the field of materials hand- ling equipment poses particular problems because complex plants con- sist of individual components having quite different remaining service lives. For this reason, a systematic, proven procedure is proposed for the refurbishment of large materials handling equipment, designed to ensure economic implementation in accordance with the company goals._x000D_
Rheinbraun2 has been using materials handling equipment since 1900, the largest units today being bucket-wheel excavators with a daily capacity of 240,000 bank cubic metres of overburden and a service weight of up to 13,500 t (metric tons). Since 1975, more than 50 large-scale refurbish- ment projects have been carried out in the company. In the process, refur- bishment has turned out to be the proven alternative to replacement of large materials handling equipment. Rheinbraun Engineering,3 a Rhein- braun subsidiary, carries out planning, consulting, and supervising work in the implementation of refurbishment projects in Germany and abroad._x000D_
The most recent example is the refurbishment of Dredger 11 of the State Electricity Commission of Victoria in cooperation with Krupp-Australia, Melbourne.
Rheinbraun2 has been using materials handling equipment since 1900, the largest units today being bucket-wheel excavators with a daily capacity of 240,000 bank cubic metres of overburden and a service weight of up to 13,500 t (metric tons). Since 1975, more than 50 large-scale refurbish- ment projects have been carried out in the company. In the process, refur- bishment has turned out to be the proven alternative to replacement of large materials handling equipment. Rheinbraun Engineering,3 a Rhein- braun subsidiary, carries out planning, consulting, and supervising work in the implementation of refurbishment projects in Germany and abroad._x000D_
The most recent example is the refurbishment of Dredger 11 of the State Electricity Commission of Victoria in cooperation with Krupp-Australia, Melbourne.
Contributor(s):
M Matz
-
Refurbishment and Modernization - the Proven Alternative to Replacement of Large Materials Handling EquipmentPDFThis product is exclusive to Digital library subscription
-
Refurbishment and Modernization - the Proven Alternative to Replacement of Large Materials Handling EquipmentPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1989
- PDF Size: 0.216 Mb.
- Unique ID: P198902037