Conference Proceedings
Second Large Open Pit Mining Conference, Latrobe Valley Vic
Conference Proceedings
Second Large Open Pit Mining Conference, Latrobe Valley Vic
The Application of Accurate Delays in Open Pit Blasting Operations
The effect of accurate detonator delay timing on blast results can now be studied with the development of the ICI Electronic Detonator. This detonator has an accuracy and precision orders of magnitude greater than the current range of pyrotechnic delay detonators. A series of field trials have been conducted to quantify the effect of delay accuracy and timing on blast performance. These trials have demon- strated that delay timing can have a marked influence on blast fragmen- tation, muckpile displacement, blast vibration and airblast.
Contributor(s):
G G Paine
-
The Application of Accurate Delays in Open Pit Blasting OperationsPDFThis product is exclusive to Digital library subscription
-
The Application of Accurate Delays in Open Pit Blasting OperationsPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1989
- PDF Size: 0.409 Mb.
- Unique ID: P198902041