Conference Proceedings
Second Large Open Pit Mining Conference, Latrobe Valley Vic
Conference Proceedings
Second Large Open Pit Mining Conference, Latrobe Valley Vic
TS5 Spreader as Part of the Secondary Overburden System at Loy Yang Open Cut
In the future to excavate sufficient coal for power generation, two dredgers would be required to dig overburden or interseam 70010 of the time and three dredgers 40010 of the time. One overburden system was not adequate for this requirement, making coal production reliability vulnerable. TS5 spreader is the new machine element of this system. The selection of the best type of machine configuration to suit the application was then subject to an internal SECV VE Study, a registration of interest and a tender for two machine alternatives. This paper outlines the reasons why SECV planned the Secondary Overburden System and how the Krupp machine met these requirements. It also identifies the main design features of the machine and its constructability which will allow the machine to be operational by the end of May, 1990.
Contributor(s):
P G Wagner
-
TS5 Spreader as Part of the Secondary Overburden System at Loy Yang Open CutPDFThis product is exclusive to Digital library subscription
-
TS5 Spreader as Part of the Secondary Overburden System at Loy Yang Open CutPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1989
- PDF Size: 0.407 Mb.
- Unique ID: P198902047