Conference Proceedings
Second Project Development Symposium, Sydney
Conference Proceedings
Second Project Development Symposium, Sydney
Commissioning a Large Coal Blending and Preparation Plant
The Curragh coal mining operation was designed and constructed to produce two coals initially at a rate of 4.3Mtpa. These are a high thermal energy steam coal primarily for domestic electricity generation and a low ash high quality coking product for the export market. Treatment of coals from four seams to achieve this requires a large and complex preparation plant and blending facilities incorporating state of the art technology._x000D_
This facility was constructed during 1982/83._x000D_
It has been designed for expansion to 6.8Mtpa capacity. The preparation and handling facilities were built at a cost of approximately A$80 million. Equipment includes 500 plus electric drives with a total capacity of 20 000kw. Commissioning was carried out in three phases : Staging - of the control system Coal Handling Facilities - conveyors, stackers and reclaimers for raw and product coals The Coal Preparation Plant - heavy media cyclones and froth flotation. A period of three months was devoted to the commissioning of the plant before requiring product coal to contract specification. This paper will describe the planning, implementation and results achieved.
This facility was constructed during 1982/83._x000D_
It has been designed for expansion to 6.8Mtpa capacity. The preparation and handling facilities were built at a cost of approximately A$80 million. Equipment includes 500 plus electric drives with a total capacity of 20 000kw. Commissioning was carried out in three phases : Staging - of the control system Coal Handling Facilities - conveyors, stackers and reclaimers for raw and product coals The Coal Preparation Plant - heavy media cyclones and froth flotation. A period of three months was devoted to the commissioning of the plant before requiring product coal to contract specification. This paper will describe the planning, implementation and results achieved.
Contributor(s):
T J Kuzman
-
Commissioning a Large Coal Blending and Preparation PlantPDFThis product is exclusive to Digital library subscription
-
Commissioning a Large Coal Blending and Preparation PlantPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1986
- PDF Size: 0.517 Mb.
- Unique ID: P198605003