Skip to main content
Conference Proceedings

Second Project Development Symposium, Sydney

Conference Proceedings

Second Project Development Symposium, Sydney

PDF Add to cart

The Planning of Pre-Commitment Phase Geotechnical Investigation in the Lochiel Coal, South Australia

Geotechnical conditions in the Lochiel Deposit are somewhat unusual, and thus geotechnical and hydrological investigations have assumed a high priority. The cost of mining the deposit has been shown to be very sensitive to geotechnical design parameters, and it is now seen to be of paramount importance to establish a high level of confidence in the design parameters used for mining cost estimation. Geotechnical investigations in the Lochiel Deposit reached a crossroads in 1985, when there appeared to be several quite different and equally attractive routes to follow to establish a satisfactory level of confidence in geotechnical mine design parameters. Three main options were identified, referred to as the No Further Work Route, the Drill and Trench Route, and the Trial Pit Route. The No Further Work Route was ruled out as being technically unsound and as satisfying none of the Electricity Trust of South Australia's (ETSA's) or the State Government's requirements. The planning process for further geotechnical investigation involved: clearly identifying the current status of work and significant geotechnical and geological factors planning and costing the alternative schemes for improving knowledge assessing the increase in knowledge to be gained from the alternative schemes . choosing the preferred scheme This process resulted in ETSA's
Return to parent product
  • The Planning of Pre-Commitment Phase Geotechnical Investigation in the Lochiel Coal, South Australia
    PDF
    This product is exclusive to Digital library subscription
  • The Planning of Pre-Commitment Phase Geotechnical Investigation in the Lochiel Coal, South Australia
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1986
  • PDF Size: 0.338 Mb.
  • Unique ID: P198605024

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.