Conference Proceedings
Second Project Development Symposium, Sydney
Conference Proceedings
Second Project Development Symposium, Sydney
The Rapid Implementation of the Pine Creek Gold Project
The Pine Creek gold mining development consists of a 1000000 tonne/yr open cut mine, a carbon-in-pulp processing plant and support facilities. The operation is located at Pine Creek, 230 km south of Darwin in the Northern Territory. The mine was officially opened in late October 1985, having been designed and constructed in less than twelve months, despite front end expenditure constraints and unseasonal cyclonic rains shortly after commencement of site activity. Non-traditional methods and attitudes were required to be adopted by both Engineer and Owner to successfully bring the project from preliminary design through construction and commissioning in a minimum time. Those areas which differ from the more traditional approaches to Project Management are examined together with a review of the advantages and penalties of these methods.
Contributor(s):
R Winby, R W Buttrose
-
The Rapid Implementation of the Pine Creek Gold ProjectPDFThis product is exclusive to Digital library subscription
-
The Rapid Implementation of the Pine Creek Gold ProjectPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1986
- PDF Size: 0.332 Mb.
- Unique ID: P198605025