Skip to main content
Conference Proceedings

Second Project Development Symposium, Sydney

Conference Proceedings

Second Project Development Symposium, Sydney

PDF Add to cart

The Rapid Implementation of the Pine Creek Gold Project

The Pine Creek gold mining development consists of a 1000000 tonne/yr open cut mine, a carbon-in-pulp processing plant and support facilities. The operation is located at Pine Creek, 230 km south of Darwin in the Northern Territory. The mine was officially opened in late October 1985, having been designed and constructed in less than twelve months, despite front end expenditure constraints and unseasonal cyclonic rains shortly after commencement of site activity. Non-traditional methods and attitudes were required to be adopted by both Engineer and Owner to successfully bring the project from preliminary design through construction and commissioning in a minimum time. Those areas which differ from the more traditional approaches to Project Management are examined together with a review of the advantages and penalties of these methods.
Return to parent product
  • The Rapid Implementation of the Pine Creek Gold Project
    PDF
    This product is exclusive to Digital library subscription
  • The Rapid Implementation of the Pine Creek Gold Project
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1986
  • PDF Size: 0.332 Mb.
  • Unique ID: P198605025

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.