Conference Proceedings
Selective, Open Pit Gold Mining Seminar, Perth
Conference Proceedings
Selective, Open Pit Gold Mining Seminar, Perth
Grade Control at Phar Lap and Haveluck Mines Meekatharra: Techniques, Successes and Failures
Whim Creek Consolidated N.L. has operated openpit mines at Meekatharra since 1980. Mining operations commenced with the Haveluck openpit and the Phar Lap openpit was started in 1 984. Grade control in the Haveluck mine was simple because the orebody showed good continuity along strike and down dip and had an easily recognisable hanging wall contact. Problems were encountered once mining corn menced at Phar Lap because of the complex lithologies, alteration and faulting involved. Simple grade control techniques developed for Haveluck failed and were not solved until an understanding of the ore bodies was achieved._x000D_
The integration of all geological data into the interpretation of the development drilling results has proved essential to achieve effective grade control at reasonable cost.
The integration of all geological data into the interpretation of the development drilling results has proved essential to achieve effective grade control at reasonable cost.
Contributor(s):
P Alexander, D Geldard, W O'Beirne, P Payne
-
Grade Control at Phar Lap and Haveluck Mines Meekatharra: Techniques, Successes and FailuresPDFThis product is exclusive to Digital library subscription
-
Grade Control at Phar Lap and Haveluck Mines Meekatharra: Techniques, Successes and FailuresPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1986
- PDF Size: 1.316 Mb.
- Unique ID: P198602002