Conference Proceedings
Selective, Open Pit Gold Mining Seminar, Perth
Conference Proceedings
Selective, Open Pit Gold Mining Seminar, Perth
Grade Control Techniques at Paddington Gold Mine
The Paddington I and proposed Paddington II Pits are both located in what is, by Eastern Goldfields standards, a large tonnage-low grade orebody. The Pits have been designed to supply ore to a substantial Treatment Plant at the designed rate of 875,000 tpa. (This throughput is currently being increased to 1,200,000 tpa)._x000D_
Generally the orebody lends itself to large tonnage mining techniques, relying on only a relatively small amount of sampling. The surface enrichment zone and depleted zone are reasonably complex and require more intensive grade control and sampling techniques as typically utilised in many surface mines in the Eastern Goldfields, although as experience and understanding of the nature of the orebody was gained, less sampling became necessary.
Generally the orebody lends itself to large tonnage mining techniques, relying on only a relatively small amount of sampling. The surface enrichment zone and depleted zone are reasonably complex and require more intensive grade control and sampling techniques as typically utilised in many surface mines in the Eastern Goldfields, although as experience and understanding of the nature of the orebody was gained, less sampling became necessary.
Contributor(s):
H I Sandercock, Q G Amos
-
Grade Control Techniques at Paddington Gold MinePDFThis product is exclusive to Digital library subscription
-
Grade Control Techniques at Paddington Gold MinePDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1986
- PDF Size: 0.294 Mb.
- Unique ID: P198602003