Skip to main content

The AusIMM office is closed for the end of year break until Monday 6 January 2025. Please note members can pay their renewals online at ausimm.com/renew, and hardcopy publication orders will be processed on our return. We wish you a safe and happy festive season.

Conference Proceedings

Seventh International Conference & Exhibition on Mass Mining (MassMin 2016)

Conference Proceedings

Seventh International Conference & Exhibition on Mass Mining (MassMin 2016)

PDF Add to cart

Cave Tracker Flow Monitoring System Installation at Argyle Diamond Mine

Once the draw process has begun in a block cave, it is very difficult to identify which regions of the cave have successfully propagated, where the caved material is flowing from and where it is flowing to. The uncertainty around cave flow increases as the cave is drawn and can be further compounded by poor draw control practices. These uncertainties make it difficult to plan effective draw strategies to control dilution, as flow model predictions tend to gradually diverge from the actual state of the cave. There have been documented occasions where observed caving phenomena, such as muck pile surface rilling, could not be reproduced with the cave flow models of the time. The ultimate consequence of cave flow uncertainty is generally manifest as higher dilution and lower grades.In order to measure the real-time flow of caved material within an active block cave, CRC Mining and Elexon have developed, together with Rio Tinto, a cave flow monitoring system called Cave Tracker, which is being trialled at Argyle Diamond Mine (ADM) in Western Australia. The Cave Tracker system at ADM comprises electronic beacons' that have been installed down long HQ diameter drill holes located above the extraction level. As the cave-back propagates and the rock mass fragments, beacons are released into the muck pile and flow along with the caved material to the drawpoints below. At Argyle, the beacons are configured to emit a signal every three days. These signals are picked up by detectors installed on the extraction and undercut levels, allowing the positions of the beacons to be determined.By examining the real-time material flow in different regions of the cave, flow mechanisms can be better defined. Draw control strategies can then be actively tailored to manage the current state of the cave. Thus, previously undetectable indications of excessive rilling, rapid cave propagation, cave stall, air gaps and dilution entry can now be identified early and assessed continuously as the cave progresses. For the first time it is possible to amend draw strategies based on measurements from inside and outside of the fractured zones, allowing caves to be managed more effectively.CITATION:Whiteman, D, Talu, S, Wilson, M, Watt, G, Van As, A and Kuiper, P, 2016. Cave Tracker flow monitoring system installation at Argyle Diamond Mine, in Proceedings Seventh International Conference and Exhibition on Mass Mining (MassMin 2016), pp 479-488 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Return to parent product
  • Cave Tracker Flow Monitoring System Installation at Argyle Diamond Mine
    PDF
    This product is exclusive to Digital library subscription
  • Cave Tracker Flow Monitoring System Installation at Argyle Diamond Mine
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2016
  • PDF Size: 2.17 Mb.
  • Unique ID: P201602051

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.