Development and Evaluation Processes of Cave Production Schedules for the Resolution Copper Project
Resolution Copper Mining LLC (RCML) is one of the largest undeveloped high-grade porphyry copper-molybdenum deposits in the world, with an orebody at depths of approximately 2000 m beneath post-mineralisation cover. With a vision to develop a large-scale, low-cost operating mine, the project is designed as a micropanel cave with an advanced undercut.In September 2014, RCML began a study focusing on identifying and selecting the best production cases to eventually reach full production (120 kt/d). To achieve this, a methodology was developed that allows the fast evaluation of a large number of production schedules.Dassault Systmes GEOVIA was commissioned to enhance the Footprint Finder program for batch scheduling panel cave production. The tonnage and grade schedules produced by Footprint Finder were compared to schedules developed using personal computing block caving (PCBC). The inputs to Footprint Finder were then adjusted to achieve a reasonable correlation with the PCBC schedules.The enhanced Footprint Finder program was used to batch-process nearly 54 000 schedules using 20 elevations, 17 shutoff grades, four heights of draw, two different copper grades (modelled and upside), two layout refinements within the existing footprint and a variety of production ramp-up rates to 120 kt/d. The study team developed processes to analyse large amounts of data, to assist in selecting a matrix of the best schedules for detailed assessment using PCBC. Three hundred PCBC schedules were developed.The detailed trade-offs between the scenarios is currently underway with promising results. This paper outlines the methodology used in evaluating the numerous alternatives.CITATION:Gantumur, J, Godard, R, Prince, F and Pascoe, C, 2016. Development and evaluation processes of cave production schedules for the Resolution copper project, in Proceedings Seventh International Conference and Exhibition on Mass Mining (MassMin 2016), pp 59-64 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Contributor(s):
J Gantumur, R Godard, F Prince, C Pascoe
-
Development and Evaluation Processes of Cave Production Schedules for the Resolution Copper ProjectPDFThis product is exclusive to Digital library subscription
-
Development and Evaluation Processes of Cave Production Schedules for the Resolution Copper ProjectPDFNormal price $22.00Member price from $0.00