Conference Proceedings
Seventh International Conference & Exhibition on Mass Mining (MassMin 2016)
Conference Proceedings
Seventh International Conference & Exhibition on Mass Mining (MassMin 2016)
Development of the Ore Handling System at the Grasberg Block Cave Mine, Indonesia
The Grasberg Block Cave (GBC) Mine is one of the future underground mines of PT Freeport Indonesia (PTFI). Located in the remote highlands of Papua, Indonesia, the GBC mine is scheduled to start production in 2017 reaching its peak production capacity of 160 000 t/d in 2023.In order to reach planned production capacity, the GBC mine will utilise an ore handling system consisting of rail haulage, crushing and conveying. The rail haulage system will utilise over 20 km of track while crushing is accomplished by way of three gyratory crushers each with a capacity of 3300 t/h. Nine conveyors operating in two parallel systems, each system over 3 km in length, will move the ore from the crushers to the stockpiles. These systems require a network of larger tunnels and mass excavations to accommodate the planned production facilities.This paper will describe the ore handling system, tunnel and mass excavation methodology as well as some of the challenges encountered with ground conditions and excavation quality during the execution of the project. A combination of lateral and vertical development methodologies and equipment, including drill jumbos, mechanised raise climbers and specialised ground support equipment, have proven successful in the development of a quality ore handling system.CITATION:Pasek, I, Firdausi, H and Chenier, T, 2016. Development of the ore handling system at the Grasberg block cave mine, Indonesia, in Proceedings Seventh International Conference and Exhibition on Mass Mining (MassMin 2016), pp 599-608 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Contributor(s):
I Pasek, H Firdausi, T Chenier
-
Development of the Ore Handling System at the Grasberg Block Cave Mine, IndonesiaPDFThis product is exclusive to Digital library subscription
-
Development of the Ore Handling System at the Grasberg Block Cave Mine, IndonesiaPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2016
- PDF Size: 1.453 Mb.
- Unique ID: P201602063