Skip to main content

The AusIMM office is closed for the end of year break until Monday 6 January 2025. Please note members can pay their renewals online at ausimm.com/renew, and hardcopy publication orders will be processed on our return. We wish you a safe and happy festive season.

Conference Proceedings

Seventh International Conference & Exhibition on Mass Mining (MassMin 2016)

Conference Proceedings

Seventh International Conference & Exhibition on Mass Mining (MassMin 2016)

PDF Add to cart

Progressing Cave Performance into the Later Stages of the Deep Ore Zone Mine

Ongoing mining of the East Ertsberg Skarn System orebody below the Gunung Bijih Timur and Intermediate Ore Zone caves has been relatively successful and a ramp up to 80 000 t/d was achieved in the Deep Ore Zone Mine. However, the distribution of production, the overall drawpoint availability as well as the rate of change of the cave back profile has not followed the anticipated path. Several key factors influencing cave growth and progress, grade variation, fragmentation, wet muck and surface subsidence have been recognised over the life-of-mine that now have to be taken into account for planning the later stages of mining.The paper will discuss the influence of geological controls of lithology and structure - how this as well as other contributing aspects have impacted ore flow, contributing to some of the widespread panel damage, and been a key factor in compacted draw columns and caused an accelerated appearance of water ingress. This in turn has rapidly changed the distribution of wet drawpoints requiring remote mucking and special controls that also affect the call from the remaining dry drawpoints. Comment is also made on the potential final cave profile if it continues along the current trend and some discussion is offered about possible mitigation measures if this were to come about.CITATION:Wilson, A D, Purba, A M and Sjadat, A, 2016. Progressing cave performance into the later stages of the Deep Ore Zone mine, in Proceedings Seventh International Conference and Exhibition on Mass Mining (MassMin 2016), pp 285-292 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Return to parent product
  • Progressing Cave Performance into the Later Stages of the Deep Ore Zone Mine
    PDF
    This product is exclusive to Digital library subscription
  • Progressing Cave Performance into the Later Stages of the Deep Ore Zone Mine
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2016
  • PDF Size: 1.406 Mb.
  • Unique ID: P201602032

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.