Skip to main content

The AusIMM office is closed for the end of year break until Monday 6 January 2025. Please note members can pay their renewals online at ausimm.com/renew, and hardcopy publication orders will be processed on our return. We wish you a safe and happy festive season.

Conference Proceedings

Seventh International Conference & Exhibition on Mass Mining (MassMin 2016)

Conference Proceedings

Seventh International Conference & Exhibition on Mass Mining (MassMin 2016)

PDF Add to cart

Selection of Exploitation Method Based on the Experience of Hydraulic Fracture Techniques at the El Teniente Mine

The exploitation of primary ores using cave mining caused new challenges at the El Teniente mine that required changes to a number of conventional cave mining practices. For example, in the 1970s and 1980s, panel caving was introduced to manage certain geotechnical and operational conditions. Today, El Teniente mine is facing new challenges associated with deep cave mining and establishing its New Mine Level (NML) project, which is located 240 m below the Esmeralda operating cave.The engineering and development phases for this new project have been largely based on experience and lessons learned throughout the history of primary ore exploitation at El Teniente mine, particularly knowledge about seismicity control, the management of collapses and operational practices. For example, previous experience demonstrated that seismicity could be managed by preconditioning using large-scale hydraulic fracturing (HF). HF has been systematically applied in the column of ore above the undercut planned for the NML project and below the production or extraction level, where the main ventilation and haulage infrastructure are to be located.This paper discusses how this has been achieved and is based on previous experience of preconditioning using HF, which has been applied in the selection and management of exploitation techniques and associated planning strategies and design parameters for the NML project.CITATION:Pardo, C and Rojas, E, 2016. Selection of exploitation method based on the experience of hydraulic fracture techniques at the El Teniente Mine, in Proceedings Seventh International Conference and Exhibition on Mass Mining (MassMin 2016), pp 97-104 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Return to parent product
  • Selection of Exploitation Method Based on the Experience of Hydraulic Fracture Techniques at the El Teniente Mine
    PDF
    This product is exclusive to Digital library subscription
  • Selection of Exploitation Method Based on the Experience of Hydraulic Fracture Techniques at the El Teniente Mine
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2016
  • PDF Size: 1.621 Mb.
  • Unique ID: P201602010

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.