Conference Proceedings
Seventh International Conference & Exhibition on Mass Mining (MassMin 2016)
Conference Proceedings
Seventh International Conference & Exhibition on Mass Mining (MassMin 2016)
Simplifying the Ore Handling System through the Use ofCurrent Technology at Chuquicamata Underground Mine Project
The definition of an ore handling system and its consequent layout design is of crucial importance in cave mining projects. It not only represents the main driver in the production capacity and reliability of the mining system, it is also a fundamental variable in the footprint's development time and cost.In recent decades, load-haul-dump (LHD) tramming distance optimisation through the allocation of several orepasses inside the footprint has been the most common practice in ore handling system layout definition at Codelco's operations. Today, the improvement of existing technology, such as higher-capacity LHDs and jaw-gyratory crushers, and intensive preconditioning techniques to improve fragmentation allow the conceptualisation of simple and highly productive ore handling system layouts for wide caving areas that avoid the complexity and high cost of developing numerous orepasses inside the footprint.The initial macroblocks of the Chuquicamata underground mine project (PMCHS) consider an ore handling system layout in which LHDs dump into orepasses located inside the footprint area. The ore is then transferred into crusher chambers located below the production level, where it is crushed by jaw crushers and then conveyed to surface. In an effort to reduce development time and costs, a new ore handling system layout for the PMCHS experimental macroblocks was engineered using improved technologies and techniques in a simpler mining system. This paper compares the new ore handling system layout for the project's experimental macroblocks with the traditional LHD-orepass layout in terms of production capacity, reliability, development time and cost.CITATION:Paredes, P, Gajardo, D, Leao, T, Pealoza, S and Tramn, C, 2016. Simplifying the ore handling system through the use of current technology at Chuquicamata underground mine project, in Proceedings Seventh International Conference and Exhibition on Mass Mining (MassMin 2016), pp 571-584 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Contributor(s):
P Paredes, D Gajardo, T Leano, S Penaloza, C Tramon
-
Simplifying the Ore Handling System through the Use ofCurrent Technology at Chuquicamata Underground Mine ProjectPDFThis product is exclusive to Digital library subscription
-
Simplifying the Ore Handling System through the Use ofCurrent Technology at Chuquicamata Underground Mine ProjectPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2016
- PDF Size: 2.091 Mb.
- Unique ID: P201602061