Conference Proceedings
Seventh International Mining Geology Conference 2009
Conference Proceedings
Seventh International Mining Geology Conference 2009
Publication sale now on, get up to 70% off
Benchmarking Estimation Methods for Coal Resource Estimation
The coal industry in Australia has been actively working in recent years towards the (re)integration of geostatistical techniques to the process of coal resource estimation. The benefits of using geostatistical techniques, over the current interpolation algorithms in use in coal modelling packages used to generate the grid estimates, need to be illustrated for the methodology to gain a broader acceptance in the coal industry._x000D_
This paper focuses on the benefits gained at BHP Billiton Mitsubishi Alliance's Saraji mine for the estimation of the total product yield value at a 9.7 per cent product ash cut-off of a particular seam of the Saraji deposit._x000D_
In order to perform this comparison, the results of the alternative estimation methodologies need to be benchmarked, which in most situations is achieved through the reconciliation of the estimates against production and/or process plant reconciliation data. Unfortunately, this benchmarking was not possible as no reconciliation data for the area of interest in the chosen seam was available, as it has not been mined at the time of the study._x000D_
Where no reconciliation data is available, an alternative method is to use conditional simulations as the benchmark for comparison. The simulated values can be regarded as reality', and the alternative estimation methodologies, based on a sampling of the underlying reality', can then be compared using the simulated reality' as the benchmark for comparison._x000D_
FORMAL CITATION:Casley, Z, Bertoli, O, Mawdesley, C, Davies, G and Dunn, D, 2009. Benchmarking estimation methods for coal resource estimation, in Proceedings Seventh International Mining Geology Conference 2009, pp 259-264 (The Australasian Institute of Mining and Metallurgy: Melbourne).
This paper focuses on the benefits gained at BHP Billiton Mitsubishi Alliance's Saraji mine for the estimation of the total product yield value at a 9.7 per cent product ash cut-off of a particular seam of the Saraji deposit._x000D_
In order to perform this comparison, the results of the alternative estimation methodologies need to be benchmarked, which in most situations is achieved through the reconciliation of the estimates against production and/or process plant reconciliation data. Unfortunately, this benchmarking was not possible as no reconciliation data for the area of interest in the chosen seam was available, as it has not been mined at the time of the study._x000D_
Where no reconciliation data is available, an alternative method is to use conditional simulations as the benchmark for comparison. The simulated values can be regarded as reality', and the alternative estimation methodologies, based on a sampling of the underlying reality', can then be compared using the simulated reality' as the benchmark for comparison._x000D_
FORMAL CITATION:Casley, Z, Bertoli, O, Mawdesley, C, Davies, G and Dunn, D, 2009. Benchmarking estimation methods for coal resource estimation, in Proceedings Seventh International Mining Geology Conference 2009, pp 259-264 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Contributor(s):
Z Casley, O Bertoli, C Mawdesley, G Davies, D Dunn
-
Benchmarking Estimation Methods for Coal Resource EstimationPDFThis product is exclusive to Digital library subscription
-
Benchmarking Estimation Methods for Coal Resource EstimationPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2009
- PDF Size: 1.512 Mb.
- Unique ID: P200908032