Skip to main content
Conference Proceedings

Seventh International Mining Geology Conference 2009

Conference Proceedings

Seventh International Mining Geology Conference 2009

Publication sale now on, get up to 70% off

PDF Add to cart

Ore Block Optimisation for Open Pit Grade Control

The main task of grade control on a daily basis is to define the material that should be mined to a destination under various categories. This can be determined by grade, lithology, quality and blending criteria. In the case of multi-element deposits or deposits with various blending or other processing criteria the optimum selection of ore block boundaries can be quite complex._x000D_
In every case the balance between ore loss and dilution must be considered when designing the ore block boundaries and this becomes a risk-based decision when using the conditional simulation model. The use of such systems allows grade control to meet specific targets, such as budget tonnages and grades and blended product specifications._x000D_
Two case studies are presented: the Prominent Hill copper/gold mine and the Rapu Rapu zinc/copper mine. Mining is based on a rational grade control strategy involving a number of factors, including strong geological control, advanced geostatistical approaches, such as conditional simulation, and optimisation of the ore blocking to meet production requirements. This provides an objective, transparent and repeatable grade control strategy._x000D_
FORMAL CITATION:Khosrowshahi, S, Shaw, W J and McKevitt, M B, 2009. Ore block optimisation for open pit grade control, in Proceedings Seventh International Mining Geology Conference 2009, pp 141-146 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Return to parent product
  • Ore Block Optimisation for Open Pit Grade Control
    PDF
    This product is exclusive to Digital library subscription
  • Ore Block Optimisation for Open Pit Grade Control
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2009
  • PDF Size: 1.093 Mb.
  • Unique ID: P200908020

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.