Skip to main content
Conference Proceedings

Seventh Large Open Pit Conference 2010

Conference Proceedings

Seventh Large Open Pit Conference 2010

PDF Add to cart

Mine Planning and Risk Management Associated with the Breakthrough of the Telfer Sublevel Cave into the Active Telfer Open Pit

The Telfer main dome open pit is operated by Newcrest Mining Limited at a current production rate of 50 Mt/a from a pit dimension compromising 2 km strike length, 1 km width and 250 m depth._x000D_
As part of the refeasibility of the Telfer operation undertaken early this decade, Newcrest identified that an underground sublevel cave (SLC) operation along with an increased scale of open pit would support a new plant targeting the processing of gold and copper ore at 17 Mt/a rates._x000D_
The SLC was initiated in late 2006 and broke into the open pit in late 2009. This situation is unique across the mining industry where a cave breakthrough was planned and occurred within an active large open pit operation._x000D_
The SLC broke though into the west side of the Main Dome open pit into a specially prepared bench that was left at the 5384 RL of cut-back stage 3. A main haulage ramp is within 100 m from the edge of the cave breakthrough zone and this ramp passes down to the active levels which are progressing toward the 5200 RL._x000D_
This paper presents insight into the mine planning and risk management associated with continued operation of the open pit operation while an active SLC breaks through. The cave breakthrough presents unique areas for risk management as there is potential for rapid propagation and subsidence._x000D_
To support the undertaking, mine design and major hazard management planning has been carried out. Focus areas include; dual ramp system design, preloading the breakthrough area, monitoring of cave propagation and air gap using a seismic system and deep hole extensometers, wall stability and subsidence monitoring using radar and prism systems, and key trigger and response planning._x000D_
FORMAL CITATION:Cerny, L, Dixon, J, McArthur, C and Singh, U, 2010. Mine planning and risk management associated with the breakthrough of the Telfer sublevel cave into the active Telfer open pit, in Proceedings Seventh Large Open Pit Conference 2010, pp 93-102 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Return to parent product
  • Mine Planning and Risk Management Associated with the Breakthrough of the Telfer Sublevel Cave into the Active Telfer Open Pit
    PDF
    This product is exclusive to Digital library subscription
  • Mine Planning and Risk Management Associated with the Breakthrough of the Telfer Sublevel Cave into the Active Telfer Open Pit
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2010
  • PDF Size: 6.912 Mb.
  • Unique ID: P201005013

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.