Productivity Enhancements to Increase Ore Production from 18 to 36 Mt at Aitik
Boliden's Aitik open pit mine located in northern Sweden, will expand yearly production from 18 to 36 Mt of copper ore during 2010. The expansion includes a new concentrator located 3 km off the pit, two new apron feeder crushers connected to the ore storages and concentrator with conveyors at a total length of 7 km. The concentrator has two lines with autogenous grinding mills and flotation each with a capacity of 18 Mt._x000D_
Consequently the mine operation has to be expanded. To achieve this, there was several parallel processes ongoing; investments in new equipment, reorganisations, improvement projects in maintenance and productivity. The Aitik 72 project was started to coordinate productivity and mine planning activities. Initially the long-term strategic mine plan called for a total movement of ore and waste to increase from 40 to 72 Mt but has today increased to 89 Mt._x000D_
Productivity projects have been focused on load and haul activities such as fuel economics (Renstrm, 2007), effective utilisation of trucks partly by increasing manning levels, improved dispatch and shovel utilisation focusing on optimal use of loader/truck fleets._x000D_
The eco-driving projects previously reported have reduced fuel consumption significantly. This project is also a productivity project, as part of the fuel savings comes from minimising idle engine hours due to queues, break-downs, operator shift changes, etc but also from under and overloading._x000D_
Effective use of truck fleets, ie transport of material, loading and dumping, thus excluding non-productive engine hours has been an essential motivator when deciding the size and number of new trucks required._x000D_
This has resulted in a reduction of the investment with at least one but maybe two trucks._x000D_
A third major project was to optimise shovels together with truck fleet by improving short-term, up to two weeks, detailed planning of drilling and shovel activities. Daily scheduled breaks for maintenance as well as planning of shovel utilisation, down to shift level are included in the production plans._x000D_
KPIs and online production reports, based on real-time monitoring of drill rigs, shovels and trucks, have been an essential tool used regularly to engage and motivate mine production personal and information reporting to management._x000D_
Several projects have already reached their goals. The projects will continue throughout 2010 to ensure that productivity targets are met._x000D_
FORMAL CITATION:Renstrm, A, 2010. Productivity enhancements to increase ore production from 18 to 36 Mt at Aitik, in Proceedings Seventh Large Open Pit Conference 2010, pp 115-120 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Consequently the mine operation has to be expanded. To achieve this, there was several parallel processes ongoing; investments in new equipment, reorganisations, improvement projects in maintenance and productivity. The Aitik 72 project was started to coordinate productivity and mine planning activities. Initially the long-term strategic mine plan called for a total movement of ore and waste to increase from 40 to 72 Mt but has today increased to 89 Mt._x000D_
Productivity projects have been focused on load and haul activities such as fuel economics (Renstrm, 2007), effective utilisation of trucks partly by increasing manning levels, improved dispatch and shovel utilisation focusing on optimal use of loader/truck fleets._x000D_
The eco-driving projects previously reported have reduced fuel consumption significantly. This project is also a productivity project, as part of the fuel savings comes from minimising idle engine hours due to queues, break-downs, operator shift changes, etc but also from under and overloading._x000D_
Effective use of truck fleets, ie transport of material, loading and dumping, thus excluding non-productive engine hours has been an essential motivator when deciding the size and number of new trucks required._x000D_
This has resulted in a reduction of the investment with at least one but maybe two trucks._x000D_
A third major project was to optimise shovels together with truck fleet by improving short-term, up to two weeks, detailed planning of drilling and shovel activities. Daily scheduled breaks for maintenance as well as planning of shovel utilisation, down to shift level are included in the production plans._x000D_
KPIs and online production reports, based on real-time monitoring of drill rigs, shovels and trucks, have been an essential tool used regularly to engage and motivate mine production personal and information reporting to management._x000D_
Several projects have already reached their goals. The projects will continue throughout 2010 to ensure that productivity targets are met._x000D_
FORMAL CITATION:Renstrm, A, 2010. Productivity enhancements to increase ore production from 18 to 36 Mt at Aitik, in Proceedings Seventh Large Open Pit Conference 2010, pp 115-120 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Contributor(s):
A Renstrom
-
Productivity Enhancements to Increase Ore Production from 18 to 36 Mt at AitikPDFThis product is exclusive to Digital library subscription
-
Productivity Enhancements to Increase Ore Production from 18 to 36 Mt at AitikPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2010
- PDF Size: 0.199 Mb.
- Unique ID: P201005016