BHP's Cannington process plant was commissioned in October 1997. The Cannington ore contains high grades of silver, lead and zinc but also contains high levels of fluorine which must be removed to produce a marketable concentrate. As a consequence the plant is more complex than the typical base metal concentrator. Some of the features of the Cannington operation include a single stage autogenous mill, multiple stages of flotation cleaning, two leach circuits, pressure filtration and a paste fill plant. The start-up and achievement of design performance for new lead/zinc operations has traditionally taken much longer than for gold or copper operation and is littered with many tales of woe with feasibility targets often not achieved (Agarwal, Brown and Katrak, 1984; Bulatovic and Wyslouzil, 1999; Leung, Andreatidis, Woodall and Alford, 1996; Sherman, 1999; Ward, 1998).
Contributor(s):
K Leung, J Andreatidis, M Duffy, C Torrisi
-
Commissioning the Cannington Project - Creating SuccessPDFThis product is exclusive to Digital library subscription
-
Commissioning the Cannington Project - Creating SuccessPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2000
- PDF Size: 0.101 Mb.
- Unique ID: P200006016