Skip to main content

The AusIMM office is closed for the end of year break until Monday 6 January 2025. Please note members can pay their renewals online at ausimm.com/renew, and hardcopy publication orders will be processed on our return. We wish you a safe and happy festive season.

Conference Proceedings

Sixth International Conference on Acid Rock Drainage (ICARD)

Conference Proceedings

Sixth International Conference on Acid Rock Drainage (ICARD)

PDF Add to cart

Acidic Airport Drainage, 20 Years and $20 Million Worth of Experience

Transport Canada (Federal Government) constructed the Halifax International Airport (HIA) near Halifax, Nova Scotia, Canada in the late-1950s. Site location criteria were primarily; direct access to the city and a raised flat topography. Unfortunately, the site chosen was located on shallow Meguma group pyritic slate bedrock. In 1982, during the construction of an airport taxiway, it became very apparent that acidic run-off from excavated bedrock at the site was having a negative impact on adjacent aquatic habitat. The ensuing 20 years involved many efforts to rectify the acidic drainage problem with mixed results. Some of the techniques which have been implemented at HIA to address the acid rock drainage (ARD) issue include: dry covers, wet covers, wetlands, electrochemical treatment, open limestone channels, limestone gravel polishing beds, agricultural limestone application, and two hydrated lime [Ca(OH)2] addition treatment plants, the first producing low density sludge and the new one that creates high-density sludge. Based on over 20 years of water quality monitoring data it is apparent that only certain acid drainage mitigation methods have been effective at HIA. In 2000 when the Halifax International Airport Authority (the Authority) took control of the operation and management of the airport, including the ARD issue, it was decided to construct a modern, highdensity sludge, hydrated lime treatment system. This new $CAN 7 million system is now in operation and is achieving compliance with water quality guidelines. Due to high operating cost, a review of methods to optimise the system is being carried out. The HIA ARD problem, though minor by comparison to most mine sites, has provided unique challenges and may provide valuable insights into this urgent environmental and financial issue.
Return to parent product
  • Acidic Airport Drainage, 20 Years and $20 Million Worth of Experience
    PDF
    This product is exclusive to Digital library subscription
  • Acidic Airport Drainage, 20 Years and $20 Million Worth of Experience
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2003
  • PDF Size: 0.369 Mb.
  • Unique ID: P200303100

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.