Skip to main content

The AusIMM office is closed for the end of year break until Monday 6 January 2025. Please note members can pay their renewals online at ausimm.com/renew, and hardcopy publication orders will be processed on our return. We wish you a safe and happy festive season.

Conference Proceedings

Sixth International Conference on Acid Rock Drainage (ICARD)

Conference Proceedings

Sixth International Conference on Acid Rock Drainage (ICARD)

PDF Add to cart

Case Study of Non-Mining Prediction and Control of Acid Rock Drainage - The Vancouver Island Highway Project

The Vancouver Island Highway Project (VIHP) was a $CAD 1.2 billion expenditure by the Province of British Columbia to improve travel safety and relieve traffic congestion between Victoria and Campbell River on Vancouver Island. In the section of highway between the Tsolum River and Oyster River, on the Inland Island Highway portion of the VIHP, over half of the rock to be cut and filled was found to be net acid generating. The Tsolum River has been impacted by metal leaching and acid rock drainage (ML/ARD) for decades from an upstream closed minesite. Geochemical testwork indicated: over half of the rock along this section of highway was potentially net acid generating based on a site-specific SNPR (=NP/SAP) criterion of 1.5; some core samples were already acidic; pyrite occurred in disseminated framboidal and gel forms; the rate of acid generation was not high; measured neutralisation potential (NP) provided some lag time for the onset of net acidity; and non-carbonate neutralising minerals prevented low pH (<4.0) from appearing in the humidity cells._x000d_>
These predictions led to ML/ARD controls involving: realignment of the highway; elevation control to minimise the volume of disturbed rock; encapsulation of blasted-rock fills within the highway, surrounded by low-permeability till and covered with asphalt; and diversion of water away from cut faces. Internal pipes drained any water reaching the fills into external ditches and ponds, where the water could be monitored and, if necessary, treated. Water from the cuts was also captured in ditches and carried to monitored ponds. Elevated aqueous sulfate concentrations in several ponds confirmed that sulfide minerals were oxidising, but the lack of both acidic pH and increasing trends in concentrations demonstrated that ML/ARD was controlled. Contingency plans for any pond that may become acidic include water treatment, which predictive testwork has shown would not require substantial amounts of limestone or lime.
Return to parent product
  • Case Study of Non-Mining Prediction and Control of Acid Rock Drainage - The Vancouver Island Highway Project
    PDF
    This product is exclusive to Digital library subscription
  • Case Study of Non-Mining Prediction and Control of Acid Rock Drainage - The Vancouver Island Highway Project
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2003
  • PDF Size: 1.469 Mb.
  • Unique ID: P200303109

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.