Skip to main content

The AusIMM office is closed for the end of year break until Monday 6 January 2025. Please note members can pay their renewals online at ausimm.com/renew, and hardcopy publication orders will be processed on our return. We wish you a safe and happy festive season.

Conference Proceedings

Sixth International Conference on Acid Rock Drainage (ICARD)

Conference Proceedings

Sixth International Conference on Acid Rock Drainage (ICARD)

PDF Add to cart

The Design, Construction, Instrumentation and Performance of a Full-Scale Overburden Stockpile Trial for Mitigation of Acid Rock Drainage, Grasberg Mine, Papua Province, Indonesia

As part of a long-term acid rock drainage (ARD) mitigation study, PT Freeport Indonesia has completed the construction of a highly instrumented, full-scale, experimental, overburden stockpile to further evaluate the behaviour of the waste rock system at Grasberg mine. A total of 24 lysimeters, 30 sets of thermistor strings and 48 oxygen-sampling ports were installed at select locations during stockpile construction. ARD flow rates and chemistry have been recorded since the start of overburden rock placement in April 2000. Measurements of in situ temperatures and oxygen concentrations quantify reaction rates and the oxygen pathways that control oxidation kinetics deep within the waste rock profile. Direct field observations show the significance of advective oxygen flow with respect to the onset of oxidation kinetics. Oxygen measurements show that the rubble zone that forms at the base of a waste rock bench provides a critical pathway for oxygen entry to the waste rock profile. Furthermore, rapid oxidation as evidenced by measured temperature increases deep within the panels of waste rock is observed to occur. The observations presented in this paper provide critical insight for understanding the mechanisms and behaviour of full-scale waste rock stockpiles with respect to ARD generation. The results of this program will assist in the future selection, testing and evaluation of appropriate mitigation measures with respect to surface and face treatments to reduce long-term ARD generation. This project is a work in progress, and at least another two-years will be required to fully understand site-specific ARD generation and ARD mitigation mechanisms. This paper will discuss various design and construction considerations, provide an overview of results achieved to date, and some preliminary interpretation of what is happening within the overburden stockpiles.
Return to parent product
  • The Design, Construction, Instrumentation and Performance of a Full-Scale Overburden Stockpile Trial for Mitigation of Acid Rock Drainage, Grasberg Mine, Papua Province, Indonesia
    PDF
    This product is exclusive to Digital library subscription
  • The Design, Construction, Instrumentation and Performance of a Full-Scale Overburden Stockpile Trial for Mitigation of Acid Rock Drainage, Grasberg Mine, Papua Province, Indonesia
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 2003
  • PDF Size: 1.085 Mb.
  • Unique ID: P200303033

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.