Debismuthising of Lead at the Bhas Lead Refinery, Port Pirie
The debismuthising plant, commissioned in 1980, is based on the Kroll-Betterton process for preliminary bismuth removal with subsequent antimony treatment for fine debismuthising. Bullion flowrate is continuous and the plant was designed to achieve low bismuth lead product at rates of up to 20 tonne/h._x000D_
Development of the first stage of the operation has enabled reliable operations at 25 tonne/h to be achieved. These developments also introduced the opportunity to treat higher bismuth bullion at up to 35 tonne/h when operating the first stage only to produce product lead of 0.029 per cent Bi, meeting the ASTM B29-55 Corroding Lead Standard.
Development of the first stage of the operation has enabled reliable operations at 25 tonne/h to be achieved. These developments also introduced the opportunity to treat higher bismuth bullion at up to 35 tonne/h when operating the first stage only to produce product lead of 0.029 per cent Bi, meeting the ASTM B29-55 Corroding Lead Standard.
Contributor(s):
T Banytis, C A Waters, J V Happ
-
Debismuthising of Lead at the Bhas Lead Refinery, Port PiriePDFThis product is exclusive to Digital library subscription
-
Debismuthising of Lead at the Bhas Lead Refinery, Port PiriePDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1985
- PDF Size: 0.488 Mb.
- Unique ID: P198501008