Conference Proceedings
Strip Mining 45 Metres and Beyond, Central Queensland
Conference Proceedings
Strip Mining 45 Metres and Beyond, Central Queensland
Papers in collection
- A New Concept in Mechanical Drives-The WABCO 120 Mechanical Truck Go to Paper
- A Study of Highwal Damage Caused by Overburden Blasting in a Strip Coal Mine Go to Paper
- An Investigation into Spoil Stability at Moura Go to Paper
- Assessment of Ground Conditions for Pre-Stripping with Bucket Wheel Excavator Go to Paper
- Availability and Utilisation Go to Paper
- Characteristics and Mechanisms of Highwall Failures in Surface Coal Mines, Bowen Basin, Queensland Go to Paper
- Dewatering the Bowmans Trial Pit Go to Paper
- Drilling and Blasting to Achieve Lower Costs for Deeper Stripping Go to Paper
- Geotechnical Investigations for New Strip Mines Go to Paper
- Mining Design for Deep Open Cut Mines Go to Paper
- Opencast Mining Systems in Multiple Seam Operation in the United States Go to Paper
- Pre-Strip-Mining by Bucket Wheel Excavators Go to Paper
- San Juan Deep Stripping Go to Paper
- Spoil Pile Instability with Reference to the Goonyella Mine, Queensland Go to Paper
- Stabilisation of Large Scale Spoil Piles in Deep Open Strip Coal Mines Go to Paper
- The Combined Use of Continuously and Discontinuously Operating Opencast Mine Equipment Go to Paper
- Theory and Technique of Ground and Aerial Photography for Geological Mapping of Strip Mine Highwalls Go to Paper
- Truck Haulage Using Overhead Electrical Power to Conserve Diesel Fuel and Improve Haulage Economics Go to Paper
PD Hours
Approved activity
- Published: 1981
- Unique ID: PA-198105