Drilling and Blasting to Achieve Lower Costs for Deeper Stripping

Potential means of lowering overall costs to permit deeper stripping include : 1. the use of larger diameter blastholes in highly-fissured strata (to reduce drilling costs); 2. dewatering from semi-permanent bores to reduce blasting costs (by maximising the use of bulk ANFO) and promote highwall stability; and 3. the use of inclined blastholes, bulk AN, staggered V1 patterns, adequate backfill and more cost-effective stemming columns._x000D_
Each of these is covered. The pumping of bulk watergels continuously raises the blasthole water column, thereby perpetuating the demand for these blasting agents. This must be a principal consideration when choosing between a bulk and a packaged watergel. Any packaged product should exhibit dimensional permanence and an energy yield per metre length equal to that of bulk ANFO. Possible ways in which controlled trajectory blasting (CTB) could benefit deeper stripping operations are outlined. By allowing the maximum use of bulk ANFO, de- watering may be a prerequisite of a viable CTB Operation.
Return to parent product
  • Drilling and Blasting to Achieve Lower Costs for Deeper Stripping
    PDF
    This product is exclusive to Digital library subscription
  • Drilling and Blasting to Achieve Lower Costs for Deeper Stripping
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1981
  • PDF Size: 0.595 Mb.
  • Unique ID: P198105008

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.