Conference Proceedings
Sustainable Mining 2010
Conference Proceedings
Sustainable Mining 2010
Kalgoorlie Consolidated Gold Mines - The Golden Pike Cut-Back - Approvals to Mining
The approvals process for a major cut-back is not a simple exercise when a mine is located alongside the community. Kalgoorlie Consolidated Gold Mines (KCGM) has been through an extensive process of government, JV owner and community consultation to ensure that necessary permitting processes and detailed studies have been completed to allow this six year extension to the open pit mine life to be achieved. With the Kalgoorlie Boulder community being on the doorstep of the mine, it is critical to ensure that the operation runs smoothly and complies to the license conditions to achieve the full value of the Golden Pike cut-back, and leave behind a sustainable legacy for the local community._x000D_
This is an ABSTRACT ONLY no paper was prepared for this presentation._x000D_
FORMAL CITATION:Berryman, T, 2010. Kalgoorlie Consolidated Gold Mines - the golden pike cut-back - approvals to mining, in Proceedings Sustainable Mining 2010, p 309 (The Australasian Institute of Mining and Metallurgy: Melbourne).
This is an ABSTRACT ONLY no paper was prepared for this presentation._x000D_
FORMAL CITATION:Berryman, T, 2010. Kalgoorlie Consolidated Gold Mines - the golden pike cut-back - approvals to mining, in Proceedings Sustainable Mining 2010, p 309 (The Australasian Institute of Mining and Metallurgy: Melbourne).
Contributor(s):
T Berryman
-
Kalgoorlie Consolidated Gold Mines - The Golden Pike Cut-Back - Approvals to MiningPDFThis product is exclusive to Digital library subscription
-
Kalgoorlie Consolidated Gold Mines - The Golden Pike Cut-Back - Approvals to MiningPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 2010
- PDF Size: 0.031 Mb.
- Unique ID: P201006035