Skip to main content
Conference Proceedings

Tenth Australian Tunnelling Conference

Conference Proceedings

Tenth Australian Tunnelling Conference

PDF Add to cart

Challenge of Design for the Westerscheldetunnel in the Netherlands

The Westerschelde tunnel will be the first permanent road link between the Dutch regions of South Beveland and South Flanders. Two tunnel tubes, each 6.6 km long, will be driven using the shield tunnelling method._x000D_
The difficult ground conditions and a water pressure of up to 6.5 bar make great demands on the design. This paper describes the problems and their solutions.
Return to parent product
  • Challenge of Design for the Westerscheldetunnel in the Netherlands
    PDF
    This product is exclusive to Digital library subscription
  • Challenge of Design for the Westerscheldetunnel in the Netherlands
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1999
  • PDF Size: 5.389 Mb.
  • Unique ID: P199901019

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.