Permanent Rockbolts - The Problems are in the Detail
Permanent rock bolts in civil engineering are taken as having to serve their design purpose for at least 50 years. In many projects the design life is specified as greater than 100 years. A review of recent Australian tunnelling projects shows that substantial differences exist in the level of corrosion protection provided for permanent steel shafted rock bolts. This paper reviews the current state of practice and sets out what the authors consider to be appropriate requirements for corrosion protection.
Contributor(s):
P Pells, R Bertuzzi
-
Permanent Rockbolts - The Problems are in the DetailPDFThis product is exclusive to Digital library subscription
-
Permanent Rockbolts - The Problems are in the DetailPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1999
- PDF Size: 0.3 Mb.
- Unique ID: P199901031