Conference Proceedings
Tenth Australian Tunnelling Conference
Conference Proceedings
Tenth Australian Tunnelling Conference
Planning and Design for Rehabilitation of a Long Road Tunnel in Himalayan Ranges, India
Many transport tunnels show distress after few decades of construction. Owing to exorbitant cost of replacement, rehabilitation of tunnels has become inevitable and rapidly gaining attention/significance worldwide. This paper discusses the detailed planning and design of remedial measures for repairs and rehabilitation of the twin tube highway tunnel in India, at an elevation of 2200 m constructed approximately 38 years ago. The tunnel length is 2547 m having 30 m2 cross-sectional area of each tube. The tunnel is lined in stretches, totalling 60 per cent lined and the remaining portions are unlined. The tunnel has developed acute problems of rock falls, water leakage, distressed pavement and icicle formation resulting in slow movement of vehicular traffic which has also increased. Suffocation inside the tunnel caused deaths due to inadequate natural ventilation, hence artificial ventilation was deemed necessary and was provided in the restricted 28.5 m2 cross-sectional area of tunnel. The paper would be useful for planners, designers and construction engineers for setting future trends.
Contributor(s):
A Garg, R K Dayal
-
Planning and Design for Rehabilitation of a Long Road Tunnel in Himalayan Ranges, IndiaPDFThis product is exclusive to Digital library subscription
-
Planning and Design for Rehabilitation of a Long Road Tunnel in Himalayan Ranges, IndiaPDFNormal price $22.00Member price from $0.00
Fees above are GST inclusive
PD Hours
Approved activity
- Published: 1999
- PDF Size: 0.405 Mb.
- Unique ID: P199901035