Structural Design of Precast Concrete Linings for Bored Tunnels - Example from the Design of an Urban Mass Rapid Transit System

The Metropolitan Rapid Transit Authority (MRTA) Initial System Project (ISP) - Underground Structures North, UGN, is the northern section of the blue line, which is the first stage of an underground mass transport rail system of 77 km to be implemented in the central area of Bangkok, Thailand. The UGN section (Huai Kwang - Bang Sue) consists of approximately 8 km of twin single track bored tunnels, nine underground stations and some short cut and cover tunnel sections._x000D_
The paper focuses on the main issues involved in the structural design of the precast concrete lining, which is the definitive structural support of the bored tunnels. It includes an overview of the site and geotechnical conditions, specific properties of precast concrete linings, ground-structure modelling, approach for the assessment of load conditions and respective sectional forces and particulars of the detailing of the reinforcement and the segment testing program.
Return to parent product
  • Structural Design of Precast Concrete Linings for Bored Tunnels - Example from the Design of an Urban Mass Rapid Transit System
    PDF
    This product is exclusive to Digital library subscription
  • Structural Design of Precast Concrete Linings for Bored Tunnels - Example from the Design of an Urban Mass Rapid Transit System
    PDF
    Normal price $22.00
    Member price from $0.00
    Add to cart

    Fees above are GST inclusive

PD Hours
Approved activity
  • Published: 1999
  • PDF Size: 0.278 Mb.
  • Unique ID: P199901059

Our site uses cookies

We use these to improve your browser experience. By continuing to use the website you agree to the use of cookies.